close Warning: Can't synchronize with repository "(default)" (/var/svn/mms does not appear to be a Subversion repository.). Look in the Trac log for more information.

Timeline



Apr 30, 2010:

12:08 PM component/Persistence created by Pedro Gea
9:40 AM Results edited by Pedro Gea
(diff)
9:17 AM Results edited by Pedro Gea
(diff)
8:55 AM Results created by Pedro Gea

Apr 29, 2010:

10:00 PM Milestone Persistence 0.5 completed
El milestone Persistence 0.5 forma parte del milestone general …
10:00 PM Milestone Estimation 0.5 completed
El milestone Estimation 0.5 forma parte del milestone general …
10:00 PM Milestone Strategy and Adapter 0.5 completed
El milestone Strategy and Adapter 0.5 forma parte del milestone …
10:00 PM Milestone Documentation and Samples 0.5 completed
El milestone Documentation and Samples 0.5 forma parte del …
10:00 PM Milestone Model 0.5 completed
El milestone Model 0.5 forma parte del milestone general de …
8:10 AM Ticket #272 (Resultados, exponente negativo en potencia de polinomios) closed by Pedro Gea
fixed: (In [1398]) Se ha modificado la expresión B**degree para poder …
7:58 AM Ticket #273 (Persistencia forecasting) closed by Pedro Gea
fixed: (In [1397]) Se soluciona un error de persistencia en los outputs. …
7:17 AM Ticket #274 (Error graficando variables) closed by Pedro Gea
fixed: (In [1396]) Se modifican los métodos para graficar las variables para …
Note: See TracTimeline for information about the timeline view.